Return to Content Exchange
Content Exchange
Your Single Source for Samples, Accelerators, and Standards

Commission Override

Overview

The Commission Override configuration enables an authorized user to override the Agent’s commission percentage on a quote. Upon issuance, the overridden percentage value is placed on a new policy specific agent-level commission plan. The overriding of the plan percentage value also overrides any plan term variations that may have been on the original plan.

Dependencies for Package

The following tools and packages are required for correct implementation of the package.

Tools Needed to Complete the Package Installation

The following tools are needed to complete the package installation:

  • Duck Creek Author
  • Duck Creek Express

Dependencies

To use this package, you must also have the following.

  • Duck Creek Policy
  • Duck Creek Billing
  • Duck Creek TransACT

Installing the Package

After you are granted access to the Content Exchange packages you requested, use the Content Exchange Package Utility to install the package. This utility can be run on the server or on your local machine.

To install a package:

  1. Download and install version 3.5.0 of the Content Exchange Package Utility
  2. Once installed, open the utility and use it to install or unzip your downloaded packages. Learn more about using this utility.
    Some packages are completely installed by the Content Exchange Package Utility while others still require some manual steps. The documentation provided with each package includes any manual steps required to successfully install that package.
Featured
Product Extensions
Go To Package